Crystal Petroleum FZE

We Store Petroleum Product.

General Information
Company Name
Crystal Petroleum FZE
Founded Year
2018
Location (Offices)
United Arab Emirates +1
Founders / Decision Makers
Number of Employees
25
Industries
-
Funding Stage
-
Social Media

Crystal Petroleum FZE - Company Profile

Crystal Petroleum FZE is an emerging independent storage facility for petroleum products located in Hamriyah, UAE. We own and operate 2 tank terminals in Hamriyah with a total capacity of 123,000 cbm. The facility has 27 nos dome roof tanks with varying capacities for flexibility in storage and blending of the petroleum products. Terminal has the facility to safely receive product by ship as well as road tankers thereby making optimum use of the terminal infrastructure. Our terminals relate to Hamriyah Port at the main as well as inner harbour by piggable dock lines which allows the client to plan vessels as per the draft restriction thereby having a reduced turnaround time in the Port. Facility is equipped with Automated Tank Gauging for continuous monitoring of the tank farm which is done through the Centralized Control Room. The terminals are operated as per the Standard Operating Procedures by a team of Operations personnel having experience of working with major Oil storage terminals. Our distinctive focus on both our clients & in providing unmatched service, coupled with a high degree of professionalism & creative logistical solutions that go way beyond traditional storage services, form the basis for an excellent partnership with our clients. Terminal Dock lines: 2 x 12” (CS lines from Main Harbour) 1 x 10” (SS line from Main Harbour) 1 x 10” (CS line from Inner Harbour) 1 x 8” (CS line from Inner Harbour) Terminal Tankage: 3 nos X 8900 cbm (Dome roof) 6 nos X 3000 cbm (Dome roof) 5 nos X 4675 cbm (Dome roof) 2 nos X 1000 cbm (Dome roof) 4 nos X 7580 cbm (Fixed roof) 7 nos X 2490 cbm (Fixed roof) Terminal receiving capacity: 1500 cbm/hr Terminal pumping capacity Centrifugal Pumps: 2 x 550 cbm/hr for ship loading Centrifugal Pump: 1 x 350 cbm/hr for ship loading Twin Screw Pump: 1 x 450 cbm/hr for ship loading Terminal Tank Truck Loading/Offloading Facility: Centrifugal Pumps: 3 x 150 cbm/hr Twin Screw Pump: 1 x 120 cbm/hr Screw Pump: 2 x 125 cbm/hr

Funding Rounds & Investors of Crystal Petroleum FZE (0)

View All

There is no investment information

Latest News of Crystal Petroleum FZE

View All

No recent news or press coverage available for Crystal Petroleum FZE.

Similar Companies to Crystal Petroleum FZE

View All

No funding or investment information available for Crystal Petroleum FZE at this time.